Klimkovice highway tunnel
Project started in June 2005 and completed in 2006.

Project type: Highway tunnel.

Location: Ostrava, Czech Republic.

Description:
Tunnel on czech highway D5.
The length of the tunnel is Tunnel A (Brno - Ostrava) is 1076 m length (857 m of mined part) and tunnel B (Ostrava - Brno) is 1088 m length (868 m of mined part).m for a cross section of 70m2.

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.

Additionnal informations
Two uni-direction two lines tunnel tubes, with emergency lanes. A and B tunnel will be interconnected by 5 crosscuts passable. Every 150 meter are situated emergency niches. In the middle of the tunnel is a 40 meter length emergency bay which will allow big vehicles to turn..


Back to top


Metro VI. C2 tunnel
Project started in 2004 and completed in 2005.

Project type: Subway Tunnel.

Location: Prague, Czech Republic.

Description:
Subway tunnel for Prague metro line C.
The length of the tunnel is 1600m .

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.


Back to top


Hnevkov II railway tunnel
Project started in 2004 and completed in 2005.

Project type: Railway tunnel.

Location: Hnevkov, Czech Republic.

Description:
Railway tunnel for Czech Republic rail company.
The length of the tunnel is 480m for a cross section of 70m2.

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.

Additionnal informations
There is 18 emergency niches built every 24 meters..
Length of complete tunnel (with cut-and-cover parts) is 464 m and mined part is 433 m length..


Back to top


Visnove tunnel
Project started in 1997 and completed in 2004.

Project type: Geological survey gallery.

Location: Visnove, Slovakia.

Description:
Geological survey gallery for future tunnel road on slovak D1 highway.
The length of the tunnel is 7480m for a cross section of 11,5m2.

Technology:
East portal (4500m): TBM method..

Additionnal informations
Includes special insulation application.
Second layout realised by concret wet shotscreeting.


Back to top


Prague circuit tunnel
Project started in 2003 and completed in 2004.

Project type: Geological survey gallery.

Location: Prague, Czech Republic.

Description:
Geological survey gallery N514 for Prague circuit tunnel (Lochkov - Radotin).
The length of the tunnel is 770m for a cross section of 25m2.

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.

Additionnal informations
Two tubes tunnel composed of left tube (two uni-directional lines), length 1620 m and right tube (three uni-directional lines), length 1659 m..


Back to top


Railway tunnel Krasikov
Project started in 2003 and completed in 2004.

Project type: Railway Tunnel.

Location: Krasikov, Czech Republic.

Description:
Tunnel for czech state railway in Krasikov (eastern Czech Republic).
The length of the tunnel is 680m .

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.


Back to top


Panenska tunnel
Project started in 2003 and completed in 2004.

Project type: Highway Tunnel.

Location: Panenska, Czech Republic.

Description:
Tunnel for czech highway under Panenska hill (northern Czech Republic).Participation in drill and blast operations..
The length of the tunnel is 2100m .

Technology:
NATM (New Austria Tunneling Method) sequential method - drill and blast.


Back to top


Metro VI. C1 tunnel
Project started in 2001 and completed in 2002.

Project type: Subway tunnel.

Location: Prague, Czech Republic.

Description:
Subway tunnel for Prague metro line C.
The length of the tunnel is 1200m for a cross section of 45m2.

Technology:
NATM (New Austria Tunneling Method) sequential method.


Back to top


Dobroskeho tunnel
Project started in 2002 and completed in 2002.

Project type: Geological survey gallery.

Location: Czech Republic.

Description:
Geological survey gallery for future road tunnel on czech highway.

Technology:
NATM (New Austria Tunneling Method) sequential method.


Back to top


Branisko tunnel
Project started in 1996 and completed in 2000.

Project type: Highway tunnel.

Location: Branisko, Slovakia.

Description:
Half profile road tunnel under Branisko mountain for slovak D1 highway..
The length of the tunnel is 4800m for a cross section of 65m2.

Technology:
NATM (New Austria Tunneling Method): Sequential method - drill and blast..


Back to top


Companies Informations
STI
:Address STI, spol. s r.o.
Hlavná 74
053 42 Krompachy
Slovakia
:Phone +421.534.451.030
+421.534.452.054
:Fax +421.534.297.396
:E-mail sti@sti.sk
 
DPS CZ
:Address DPS cz, spol. s r.o.
Zenklova 32
180 00 Praha 8 - Liben
Czech Republic