logo

Loading

Tunnel Lohmeberg

2-lane railway tunnel of HSR Ebensfeld – Erfurt – Berlin. 2010 - 2011

Construction period:
2010-2011

Project type:
2-lane railway tunnel of HSR Ebensfeld – Erfurt – Berlin

Location:
North part of Thuringian Forest, Thuringia, Germany

Description:
The 688 Meter long Tunnel crosses below the hill of Lohmeberg (maximum coverage height 60m). Steep slope on South Portal at Schobsetal and smooth hill on North Portal.
Clear height: 10,63 m
Clear width: 10,64 m
Total excavation: ca. 125.000 m³

Technology:
NATM (New Austrian Tunneling Method) predominantly method drill and blast (few sequences by excavator).

Additional information:
The works were executed as Subcontractor of the “Joint venture Brandkopf – Lohmeberg”.

For the purpose of analyzing traffic and providing social media functions, we use cookies.