logo

Loading

Tunnel Svrčinovec

Highway tunnel. 2014 - 2016

Construction period:
2014-2016

Project type:
Highway tunnel

Location:
Svrčinovec, Slovakia

Description:
The Svčinovec tunnel is a T/-category unidirectional twin-tube tunnel, which is designed for motorway traffic. For safety reasons, the tunnel tubes are interconnected by two cross passages. The total lengths of the left tunnel tube and right tunnel tube are 445m and 420m respectively. The basic net height of 4.5m is increased to 5.2m in the center of the profile. The entire profile of the tunnel is tilted. Longitudinal ventilation is designed for the tunnel. There is an obstacle the tunnel must overcome. It is the ridge of Košarisko Hill (617m a.s.l.), which is found north of the town of Svčinovec. The tunnel overburden height varies from 6 to 27m. An invert is designed to be built throughout the tunnel length because of the relatively highly squeezing character of the rock mass.

Technology:
NATM (New Austrian Tunneling Method): Sequential method - drill and blast, Mechanical excavation.

For the purpose of analyzing traffic and providing social media functions, we use cookies.